Lambretta Li150 rebuild, more progress

Posted by Barry on Jan 23, 2012 in Uncategorized |

Had a few hours in the shed yesterday & managed to get a few little jobs done.

I wrestled the petrol tank into place with the brand new stainless steel tank straps, what an effort that was!

Plus I installed a new lock into the Tool Box door & then installed that into the body.

Reply

You must be logged in to post a comment.

Copyright © 2012 Barry Smyth’s Blog All rights reserved. Theme by Laptop Geek.